Command Ute Tray Reverse Parking Sensors Long Leads

Command  |  SKU: CMD-91CMD10-4
Cash
$95.95
Standard price
Pro
$93.07
With tools.com Pro
Finance
$1.97
/week
Save on every purchase
Theft replacement plan

The Command CMD10-4 sensors are mounted by small screws. This product is ideal for those who want the protection of reversing sensors on vehicles where they may be mounted under the tray of a ute or commercial vehicle.

The CMD10-4 suits 12V and 24V applications.

Obstruction Warning Guide:
1.5m - Slow warning beep as distance decreases.
0.3m - Rapid warning beep as distance decreases.

Sensitivity Adjustment:
There are 2 adjustments that can be made to reduce sensor sensitivity levels.
Inner sensors - for tow bar mount for example.
All sensors - for spare wheels, 4WD and accessories, personalised reversing applications.

These functions are controlled by the slide switch and the tuning screw on the Digital Control Module.
Please note this will reduce the maximum detection range of the sensors.

This series is available in a 4 black sensor configuration for extra ultrasonic coverage.

This system is automatically activated when reverse gear is selected.


Specifications
Sensor fitment: Tray type (saddle bracket)
Sensor colour: Matte black - paintable
Sensor size: 65mm*30mm*30mm
Warning type: Audible buzzer
Detecting range: 0.2m - 1.5m
Sensor adjustment: Yes - slide switch (inner), adjuster screw (all)
Volume control: No
Ingress protection: Sensor IP67, module none
Connector type: Screw type to small 2 pin
Frequency: 40KHz
Power supply: 9-24v
Lead length: 2.5m (sensor to module, extension available)
Pack Includes: 4 x black tray mount sensors, 1 x CMD10 module, 1 x buzzer, power harness, angled rubber mounting pads to adjust sensor angle, sensor fitting kit, 3M sticky backed Velcro, cable ties.

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.