Join
Proto save
$0.80
Specifications
Sensor fitment: Tray type (saddle bracket)
Sensor colour: Matte black – paintable
Sensor size: 65mm*30mm*30mm
Detecting range: 0.2m – 1.5m
Sensor adjustment: Yes – slide switch (inner), adjuster screw (all)
Volume control: No
Ingress protection: Sensor IP67, module none
Connector type: Screw type to small 2 pin
Frequency: 40KHz
Power supply: 9-24v
Lead length: 2.5m (sensor to module, extension available)
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.